Meetup at the Red Covered Bridge in Westfir at 9AM.
Following up on all the great work completed on our recent “Dip & Drain” workparty, we’ll be working on the final lower Alpine section in need of some drainage maintenance from both north and south of the 683-road trail crossing.
This will be our last drainage maintenance effort on lower Alpine before expected snow levels make it impossible to access the areas that need our help most.
Of course, this workday is weather pending. Wear appropriate gear for working in the woods, including sturdy shoes, long pants, gloves and a hardhat. It will likely be cold and damp, so a pack with extra layers/gloves is advised. Tools and hardhats will be supplied if needed. Bring some food and water to get you through the day.
